• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer
Ekeohm

Ekeohm

Electrical service and quality without compromise

1300 353 646 (1300 EKEOHM)

  • Home
  • Services
    • Projects and Construction
    • Client Services
    • ICT/Data/AV/WiFi/CCTV
    • Emergency & Exit Lighting
    • Electrical Installations
  • About Us
  • Contact Us

Broughton Anglican College – Stage 13B Upgrade

End Customer:Broughton College
Location:Menangle Park, NSW
Duration:6 Months
Capability:Communications & CCTV

Overview

Broughton College is a co-educational, Pre-Kinder – Year 12 Anglican school, located at Menangle Park between Campbelltown and Camden NSW, priding itself on quality, Christian education, excellent opportunities, and fine academic standards. The college is undergoing a redevelopment and expansion, involving the upgrade and new installation of services infrastructure to accommodate the expansion planning.

Scope

Ekeohm were engaged to implement a communications structured cabling and UPS installation to service the Stage 13 development. The scope included CAT6 UTP and CAT6A Shielded Clipsal structured solution with a fibre ring backbone system and a UPS backup system to accommodate new servers and switches within the communications room.

Project challenges

The project experienced challenges due to the impact of COVID-19 in the delay of programmed activities and materials procurement and delivery.

How we managed this

Ekeohm overcame the challenges of delay by early identification and notification of activities that may be impacted by delay and relied upon one of our core business pillars of value, by identifying a locally produced and cheaper product that could be used as an alternative to delayed materials, which met the clients budget expectations, as well as performance of the design. Proactive clear communication with stakeholders allowed for better planning and management of other stakeholder’s activities and resulted in a lesser impact to the overall completion than was originally forecast.

Key customer outcomes

The customer desired to have the facility open, operational, and meeting the design requirements to enable a modern approach to education and the educational facilities available to students. The project was delivered to the standards required to achieve this, on-budget and within the timeframe. 

Safety & Quality

Ekeohm relies upon its core values of safety, quality, value, and innovation and demonstrated implementation of these values through the delivery of this project. The project incurred over 800hours of labour with zero FAI, MTI or LTI’s, with 5 positive safety interactions. Ekeohm demonstrated why we are aligned with industry leading businesses, through a proactive quality and value approach, which contributed to delivering the project within budget, on-time, and defect free.

Primary Sidebar

Featured Current Projects

  • Fort St Public School Upgrade
  • Sydney Water Science Park 
  • 96 North Steyne

Featured Recent Projects

  • Woolooware Bay Town Centre
  • Vibe Hotel Rooftop Bar
  • Schools at the Meadowbank Employment and Education Precinct
  • Fabbrica Pasta Shop
  • Mountain Goat Brewery

Back to Projects & Construction

Footer

Home
Projects and Construction
Client Services
About Us
Contact Us
Privacy Policy

SERVICE AREAS

Sydney CBD
Greater Sydney Metropolitan Area
Illawarra Region

The State of New South Wales
Australian Capital Territory

Copyright © 2025 Ekeohm

T: 1300 353 646 (1300 EKEOHM)